Engineering Reviews and Evaluations

NFPA 25, 4.1.5: The building owner or occupant shall not make changes in the occupancy, the use or process, or the materials used or stored in the building without evaluation of the fire protection systems for their capability to protect the new occupancy, use, or materials. Fire Prevention Services also does building and electrical system evaluations … Continue reading Engineering Reviews and Evaluations